CENECO SETS POWER INTERRUPTION ON JUNE 3
Central Negros Electric Cooperative, Inc. informs its consumers connected to Asdes-Gonzaga Feeder 5 (AGF 5) that maintenance activities will be conducted on June 3, Wednesday. This is to ensure reliability of distribution lines to avoid further serious damages that will result to major interruptions. Details of this outage are as follow:
Date: June 3, 2020 – Wednesday
Reasons:
• Extension of 1-span 3-phase primary line;
• Erection of 1-35ft concrete pole; and
• Installation of 3-75KVA private-owned distribution transformer together with its accessories and stringing of its service wire at Occidental Ice Plant & Cold Storage, Lopez-Jaena St., Bacolod City.
Time: 9am to 11am
Areas Affected: AGF5 (portion only) Along Lopez-Jaena Sts., Brgy. 28, Bacolod City.
Electricity consumers are further advised that, in the event of any power interruption, electrical switch/es should be turned-off for safety reasons. When electricity supply resumes, please provide allowance of about 10-15 minutes before switching on all electrical appliances and facilities to avoid power surge. For inquiries, please call your CENECO Call Center at telephone numbers 458-6777 local 1101, 1102, 1103 and 1107.
Sorry for the inconvenience.
(SGD.) ENGR. JOSE M. TANIONGON
OIC – Office of the General Manager
Comments