ALL IN A DAY’S WORK
Rush hour scenes at North Capitol Road, B.S. Aquino Drive, Narra Extension, Gonzaga Street, and Lopez Jaena St. in Bacolod City yesterday afternoon, July 22
ONGOING ROAD WORKS. At the corner of B.S. Aquino and Narra Extension streets which is part of the 3-km. B.S. Aquino Drive in Bacolod City, a “Road Work Ahead” sign gives guidance and ensures that motorists and pedestrians are warned of the hazards at the road work site.* (James G. Toga photo)
ROAD WORKS AHEAD. At B.S. Aquino and Narra Extension streets which is part of the 3-km. B.S. Aquino Drive in Bacolod City, a “Road Work Ahead” sign gives guidance and ensures that motorists and pedestrians are warned of the hazards at the road work site.* (James G. Toga photo)
Comments