Wednesday, September 18, 2024
Your Vigilant Daily Newspaper


ALL IN A DAY’S WORK

July 23, 2022

Rush hour scenes at North Capitol Road, B.S. Aquino Drive, Narra Extension, Gonzaga Street, and Lopez Jaena St. in Bacolod City yesterday afternoon, July 22

 ONGOING ROAD WORKS. At the corner of B.S. Aquino and Narra Extension streets which is part of the 3-km. B.S. Aquino Drive in Bacolod City, a “Road Work Ahead” sign gives guidance and ensures that motorists and pedestrians are warned of the hazards at the road work site.* (James G. Toga photo)

ROAD WORKS AHEAD. At B.S. Aquino and Narra Extension streets which is part of the 3-km. B.S. Aquino Drive in Bacolod City, a “Road Work Ahead” sign gives guidance and ensures that motorists and pedestrians are warned of the hazards at the road work site.* (James G. Toga photo)

WHO’LL GIVE WAY? A minor delay in traffic flow occured along North Capitol Road before a pickup truck yielded by turning left to Aguinaldo Street during rush hour in Bacolod City late Friday afternoon of July 22.* (James G. Toga photo)
ROCK-BRAKE MECHANISM’. A panel truck crew uses a rock he picked up on the left side of the road to stop the vehicle from moving backward at the corner of Lopez Jaena and Gonzaga Streets in Bacolod City Friday afternoon of July 22.* (James G. Toga photo)

 

Comments


Leave a Reply


Your email address will not be published. Required fields are marked *