ALL IN A DAY’S WORK
Rush hour scenes at North Capitol Road, B.S. Aquino Drive, Narra Extension, Gonzaga Street, and Lopez Jaena St. in Bacolod City yesterday afternoon, July 22
Â
ONGOING ROAD WORKS. At the corner of B.S. Aquino and Narra Extension streets which is part of the 3-km. B.S. Aquino Drive in Bacolod City, a “Road Work Ahead” sign gives guidance and ensures that motorists and pedestrians are warned of the hazards at the road work site.* (James G. Toga photo)
ROAD WORKS AHEAD. At B.S. Aquino and Narra Extension streets which is part of the 3-km. B.S. Aquino Drive in Bacolod City, a “Road Work Ahead” sign gives guidance and ensures that motorists and pedestrians are warned of the hazards at the road work site.* (James G. Toga photo)






Comments